Enquiry
→Service · FTTx

Fibre site management.Into every home.

Site management for FTTx and FTTH roll-out: route construction, house connections and management of all crews on site. So metres and connections stay on schedule.

Send an enquiry

In fibre roll-out, coordination sets the pace. Many crews, many residents, many interfaces: without clear management on site, excavators stand idle and house connections are left undone.

I organise the site so that every crew knows what it is doing the next day and the client can see the actual status at any time. Work is properly recorded so billing goes through without discussion.

20+

people coordinated on site

4clients

clients from networks and rail

24h

response time to enquiries

01What I take on
01

Route construction

  • Construction scheduling by section
  • Traffic management orders and site safety
  • Coordinating open trenching and HDD
  • Accepting surface reinstatement
02

House connections

  • Scheduling with property owners
  • Status tracking per connection
  • Assigning crews and subcontractors
  • Following up defects until acceptance
03

Documentation

  • Daily and weekly reports
  • Photo and as-built documentation
  • Work and materials records
  • Checking measurement and billing
02References
  1. 01

    Gevelsberg-Berge

    FTTx site management: civil route surveyed by GPS, more than 290 house connections, 6 street cabinets

    6,178.52 m route
  2. 02

    Dorsten

    Fibre civil works with house connections

    FTTx

All references with bore profiles →

03FAQ
Who do you work for in fibre roll-out?

For network operators, general contractors and civil contractors. My clients and partners include Westnetz, Jonasson Projekte GmbH and Deutsche Glasfaser.

Do you also take on individual sections?

Yes. From September 2027 I take on sections or complete projects. Until then, smaller planning projects are possible.

Where do you work?

Main focus North Rhine-Westphalia and Lower Saxony, other regions including the Netherlands by arrangement.

04Contact

Don't talk.Deliver.

Full availability from September 2027. Smaller planning projects before then.

Request a project