Before drilling
- Bore planning and route check
- Utility enquiry and coordination with utility operators
- Permits and traffic management orders
- Defining entry and exit pits
Site management for horizontal directional drilling, from bore planning to measurement. For network operators, civil contractors and general contractors who need crossings without surprises.
An HDD bore is only as good as its preparation. Most problems on HDD sites arise before drilling starts: unclear utilities, missing permits or poorly coordinated trades.
I manage the site so that the drilling crew, civil works and client have the same status at all times. That includes clean measurement from the drilling log, so billing can be verified.
longest route, Kerpen L163
canal and Lippe crossing, Hamm
in the urban area of Dorsten
HDD backbone bore along the L163, three bridge crossings
3,800 m routeHDD crossing of the Datteln-Hamm Canal and Lippe
750 m bore lengthFour bores in the urban area
281 m totalAmong others, a 750 m crossing of the Datteln-Hamm Canal and the Lippe in Hamm-Heessen, a 3,800 m backbone route along the L163 in Kerpen with three bridge crossings, and four bores in the urban area of Dorsten.
Yes. Until September 2027 I take on smaller planning projects, for example bore and route planning, work preparation or a second opinion on planning and change orders.
Main focus is North Rhine-Westphalia and Lower Saxony, based in Georgsmarienhütte. Other regions, including the Netherlands, by arrangement.
Full availability from September 2027. Smaller planning projects before then.